Structural Support Works
Posted on 1st January 2022 at 10:29
We created a 6m wide opening on the first floor of this property, and then installed sliding aluminum doors.
All works were carried out to the engineer's specification.
Take a look at the gallery of before, during and after photos.



Share this post: